Search found 3 matches
- Thu Feb 05, 2009 8:43 am
- Forum: Support (Fortress)
- Topic: Is there any way to save a change list in Fortress
- Replies: 3
- Views: 3615
Re: Is there any way to save a change list in Fortress
Mostly it's about testing. I can't test B with A checked out, becuase A doesn't work, or may not even compile. It could also be that B uses A, and I need to make sure that B works with what A is in souce control, not whatever changes I'm making to A. Also, the changes I make to A may have unintended...
- Tue Feb 03, 2009 9:06 am
- Forum: Support (Fortress)
- Topic: Is there any way to save a change list in Fortress
- Replies: 3
- Views: 3615
Is there any way to save a change list in Fortress
I often find that I'll be working on something (Item A), and have a few files checked out, and then I'll get asked to fix a more pressing issue (Item B). I want to save what I'm working on for Item A, address Item B, and then go back to Item A. However, I can't address Item B while I have files chec...
- Fri Nov 07, 2008 10:28 am
- Forum: Support (Vault)
- Topic: How to roll back to a label/date?
- Replies: 50
- Views: 85953
Re: How to roll back to a label/date?
YES. I want to be able to roll back a specific change set/list. This seems like an elementary feature that should be available, so I was surprised to find out that it wasn't already included in Vault. My organization is planning to switch source control, and the lack of this feature may cause us to ...